Supermicro CSE-846A-R1200B Bedienungsanleitung Seite 37

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 97
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 36
4-17
Chapter 4: Chassis Setup and Maintenance
4-9 Changing the Power Distributor
Server chassis above 2U require a power distributor. The power distributor provides
failover and power supply redundancy. In the unlikely event you must change the
power distributor, do following:
Changing the Power Distributor
Power down the server and remove the plug from the wall socket or power 1.
strip.
Remove all cable connections to the power supply from the motherboard, 2.
backplane, and other components. Also, remove both power supplies.
Figure 4-19: Removing the Power Distributor Cover
Power
Distributor
Cover
Power Supply
Power Distributor Board
Mounted in the tray on
the chassis wall
Fan Row
Seitenansicht 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 96 97

Kommentare zu diesen Handbüchern

Keine Kommentare