Chapter 2: Workstation Installation
2-1
Chapter 2
Workstation Installation
2-1 Overview
This chapter provides a quick setup checklist to get your SuperWorkstation 7047GR-
TPRF up and running. Following the steps in the order given should enable you
to have the system operational within a minimal amount of time. If your system is
not already fully integrated with a motherboard, processor, system memory etc.,
please turn to the chapter or section noted in each step for details on installing
specic components.
2-2 Unpacking the System
You should inspect the box the SuperWorkstation 7047GR-TPRF was shipped in
and note if it was damaged in any way. If the workstation itself shows damage, you
should le a damage claim with the carrier who delivered it.
Decide on a suitable location for setting up and operating the SuperWorkstation
7047GR-TPRF. It should be situated in a clean, dust-free area that is well ventilated.
Avoid areas where heat, electrical noise and electromagnetic elds are generated.
You will also need it placed near a grounded power outlet.
Warnings and Precautions!
•Review the electrical and general safety precautions in Chapter 4.
• Use a regulating uninterruptible power supply (UPS) to protect the workstation
from power surges, voltage spikes and to keep your system operating in case
of a power failure.
•Allow the power supply units and Serial ATA drives to cool before touching
them.
•To maintain proper cooling, always keep all chassis panels closed when not
being serviced.